Field notes

What to bring to the breakeven seminar

Arrive with these items and your table can finish a usable model before closing remarks.

Documents

  • Latest utility bill or landlord power statement
  • Hardware list with model names and purchase dates
  • Any written power allocation from a co-location host

Measurements

  • Nameplate watts and, if available, a clamp-meter reading under load
  • Notes on cooling equipment that runs with the rack
  • Rough hours-per-day the site actually operates

Optional but helpful

A second person from finance or facilities speeds decisions when assumptions conflict. Laptops are welcome; we still hand out printed worksheets so mixed teams can annotate together.

Missing a document is better than inventing figures. Instructors will flag gaps and show how to finish the method once the numbers arrive. Reserve a seat through contact after checking the schedule.

← All field notes