Field notes
What to bring to the breakeven seminar
Arrive with these items and your table can finish a usable model before closing remarks.
Documents
- Latest utility bill or landlord power statement
- Hardware list with model names and purchase dates
- Any written power allocation from a co-location host
Measurements
- Nameplate watts and, if available, a clamp-meter reading under load
- Notes on cooling equipment that runs with the rack
- Rough hours-per-day the site actually operates
Optional but helpful
A second person from finance or facilities speeds decisions when assumptions conflict. Laptops are welcome; we still hand out printed worksheets so mixed teams can annotate together.
Missing a document is better than inventing figures. Instructors will flag gaps and show how to finish the method once the numbers arrive. Reserve a seat through contact after checking the schedule.